Simsona Corporation
  • HOME
  • CUSTOM HOMES
  • STEEL DETAILING
    • SERVICES
      • STRUCTURAL STEEL DETAILING
      • MISC. STEEL DETAILING
      • 3D LASER SCANNING
      • SCAN TO BIM
    • STEEL DETAILING PROJECTS
      • COMMERCIAL
      • RESIDENTIAL/CUSTOM HOMES
    • SAMPLES DRAWINGS
  • LIGHT GAUGE DETAILING
  • STRUCTURAL DESIGN
  • REBAR DETAILING
    • SERVICES
    • PROJECTS
    • SAMPLE DRAWINGS
  • BIM SERVICES
    • ABOUT SIMSONA BIM
    • SERVICES
      • ARCHITECTURAL BIM SERVICES
      • STRUCTURAL BIM SERVICES
      • MEP BIM SERVICES
    • BIM PROJECTS
      • ARCHITECTURAL PROJECT
      • STRUCTURAL PROJECTS
      • MEP PROJECTS
    • BIM LOD
  • GLAZING SHOP DRAWINGS
    • ABOUT
    • PROJECTS
    • SAMPLES
  • TAKEOFF SERVICES
    • ABOUT TAKEOFF
    • DIVISION 2 – SITEWORK
    • DIVISION 3 – CONCRETE
    • DIVISION 4 – MASONRY
    • DIVISION 5 – STEEL
    • DIVISION 6 – LUMBER/WOOD
    • DIVISION 7 – INSULATION/ROOFING/SIDING
    • DIVISION 8 – DOORS/WINDOWS
    • DIVISION 9 – FINISHES
    • DIVISION 10 – SPECIALTIES
    • DIVISION 15 – MECHANICAL AND PLUMBING
    • DIVISION 16 – ELECTRICAL
  • CLIENTS
  • CONTACT US
  • UPLOAD FILES
  • PAYMENTS
  • PRODUCTS
  • Windows
    • Windows
    • PVC Windows
  • Smart Home Technology
  • Menu Menu
Email: RAJ@SIMSONA.COM

Phone: 301-774-0880

Tag Archive for: Steel detailing

Bill of Materials (BOM) in Steel Detailing: A Complete Guide

October 9, 2026/in Blogs/by Praveen Kumar

bill of material in steel detailing

A Bill of Materials (BOM) is one of the most important documents produced during structural steel detailing. It provides a structured list of the materials, components, quantities, sizes, weights, and other information required to fabricate and construct a steel structure.

For steel fabricators and contractors, an accurate BOM is much more than a simple material list. It supports material procurement, estimating, fabrication planning, inventory management, shipping, cost control, and project coordination.

With modern 3D steel detailing software such as Tekla Structures, BOM information can be extracted directly from the detailed model, helping reduce manual calculations and improving consistency between the model, drawings, and fabrication information.

What Is a Bill of Materials in Steel Detailing?

A Bill of Materials (BOM) is a detailed list of the materials and components required to manufacture and assemble structural steel elements.

Depending on the project, a steel BOM can include information such as:

  • Member marks.
  • Assembly marks.
  • Part marks.
  • Steel profiles.
  • Plate dimensions.
  • Material grades.
  • Thicknesses.
  • Lengths.
  • Quantities.
  • Unit weights.
  • Total weights.
  • Bolt sizes.
  • Bolt quantities.
  • Weld information.
  • Surface treatment.
  • Coatings.
  • Miscellaneous steel components.

The exact format varies according to the fabricator, project specifications, client requirements, and fabrication system.

Why Is a BOM Important in Steel Detailing?

Structural steel projects can involve thousands of individual components.

A large commercial building may contain:

  • Hundreds of columns.
  • Thousands of beams.
  • Large quantities of connection plates.
  • Thousands of bolts.
  • Stiffeners.
  • Bracing members.
  • Miscellaneous steel.
  • Handrails and stairs.

Manually tracking all these components can be extremely difficult.

A properly prepared BOM provides a consolidated overview of the materials required for the project.

It helps project teams answer important questions such as:

What materials are required?

How much steel needs to be purchased?

How many plates are required?

How many bolts are needed?

What is the total fabricated steel weight?

Which materials have already been procured?

What materials are still required?

Key Components of a Steel BOM

A typical structural steel BOM may contain several categories of information.

1. Part Mark

The part mark identifies an individual component within the project.

For example:

  • B102.
  • C205.
  • PL305.
  • BR410.

Part marks allow fabrication teams to connect material information with shop drawings and the 3D model.

2. Assembly Mark

An assembly mark identifies a fabricated assembly.

For example, a column assembly might consist of:

  • Main column.
  • Base plate.
  • Cap plate.
  • Stiffeners.
  • Connection plates.

The assembly mark allows the fabricator to understand which individual components belong together.

3. Profile

The BOM identifies the steel section used for each structural member.

Common profiles include:

  • W-shapes.
  • HSS.
  • Channels.
  • Angles.
  • I-sections.
  • T-sections.
  • Rectangular hollow sections.
  • Circular hollow sections.

The profile information is important for procurement and fabrication.

4. Material Grade

The material grade identifies the specified strength and type of steel.

Examples may include:

  • ASTM A36.
  • ASTM A572 Grade 50.
  • ASTM A500.
  • EN 10025 grades.
  • CSA steel grades.

The applicable material grade depends on the project’s design requirements and governing standards.

5. Dimensions

For plates and fabricated components, the BOM may include:

  • Length.
  • Width.
  • Thickness.
  • Diameter.
  • Area.

For rolled sections, it may include:

  • Profile.
  • Length.
  • Weight per unit length.

6. Quantity

Quantity indicates how many identical components are required.

For example:

Part Description Quantity
B101 W18×35 beam 12
PL201 10 mm plate 24
BR301 HSS brace 8
BL401 3/4 in bolt 96

Quantity information supports purchasing, fabrication planning, and inventory management.

Steel Weight in a BOM

Steel weight is one of the most important pieces of information in structural steel projects.

The BOM may provide:

  • Individual part weight.
  • Assembly weight.
  • Total member weight.
  • Total plate weight.
  • Total project steel weight.

For rolled steel sections, weight can often be calculated using:

Weight = Length × Unit Weight

For example, if a steel section weighs 50 kg/m and the required length is 8 m:

Weight = 50 × 8 = 400 kg

In real projects, the software may calculate weights based on the actual modeled geometry.

This is particularly useful when the model contains:

  • Cuts.
  • Holes.
  • Coping.
  • Notches.
  • Plates.
  • Connection components.

 

Types of BOMs in Steel Detailing

There is not necessarily one single BOM for every project.

Different BOMs can serve different purposes.

1. Material BOM

A material BOM provides an overview of raw materials required for fabrication.

It can include:

  • Steel profiles.
  • Plates.
  • Pipes.
  • Angles.
  • Channels.
  • Bolts.
  • Other components.

This type of BOM is useful for procurement.

2. Fabrication BOM

A fabrication BOM focuses on components required to manufacture assemblies.

It may contain:

  • Part marks.
  • Profiles.
  • Plate sizes.
  • Thicknesses.
  • Quantities.
  • Material grades.
  • Assembly information.

Fabricators can use this information to organize shop production.

3. Assembly BOM

An assembly BOM lists the individual components belonging to an assembly.

For example:

Column Assembly C105

  • Main column.
  • Base plate.
  • Cap plate.
  • Four stiffeners.
  • Connection plates.
  • Bolts.

This helps fabrication teams understand how the assembly is constructed.

4. Erection BOM

An erection-oriented material list may organize steel according to erection requirements.

It can help site teams identify:

  • Member marks.
  • Assembly marks.
  • Quantities.
  • Weights.
  • Locations.

This can assist with transportation and erection planning.

5. Bolt List

Bolts may be reported separately.

A bolt list can include:

  • Bolt diameter.
  • Bolt length.
  • Bolt grade.
  • Bolt type.
  • Quantity.
  • Connection or assembly reference.

Separating bolts from primary steel can simplify procurement.

BOM vs. Material Takeoff

BOM and material takeoff are closely related but are not always identical.

A material takeoff generally focuses on determining the quantities of materials required for a project.

A BOM is typically a structured list of components and materials associated with fabrication or assembly.

For example:

Material Takeoff

125 tons of structural steel required.

BOM

W18×35 — 12 members — 96 m total — 4,800 kg
W24×55 — 18 members — 144 m total — 10,500 kg
PL 12×300×600 — 40 pieces
3/4 in bolts — 1,250 pieces

The BOM provides a much more granular breakdown.

How Is a BOM Created in Steel Detailing?

The BOM creation process generally begins with the structural design information.

Step 1: Review Design Drawings

The detailer reviews:

  • Structural plans.
  • Elevations.
  • Sections.
  • Connection details.
  • Design specifications.
  • Architectural information.

Step 2: Build the 3D Model

The steel detailer creates the structural steel model using detailing software.

Typical objects include:

  • Beams.
  • Columns.
  • Braces.
  • Plates.
  • Connections.
  • Bolts.
  • Welds.

Step 3: Add Fabrication Information

The model is developed to fabrication level.

This may include:

  • Cuts.
  • Holes.
  • Coping.
  • Plates.
  • Stiffeners.
  • Bolts.
  • Welds.
  • Connection components.

Step 4: Assign Material Information

Each component should have the appropriate:

  • Profile.
  • Material grade.
  • Thickness.
  • Size.
  • Length.
  • Other required properties.

Step 5: Number the Model

Parts and assemblies are assigned marks.

This allows the BOM to be connected to the corresponding drawings and model objects.

Step 6: Generate the BOM

Once the model has been checked, reports can be generated using the detailing software.

The BOM can then be exported or formatted according to project requirements.

BOM in Tekla Structures

For modern steel detailers, software such as Tekla Structures can automate much of the BOM generation process.

Because the BOM is generated from the detailed 3D model, information can be extracted for:

  • Parts.
  • Assemblies.
  • Profiles.
  • Plates.
  • Bolts.
  • Materials.
  • Quantities.
  • Lengths.
  • Weights.

The detailer can create different report templates depending on the project requirements.

This creates an important relationship:

3D Model → Numbering → Drawings → BOM → Fabrication

If the model is accurate, the resulting BOM can provide a reliable representation of the modeled materials.


Example of a Steel BOM

A simplified structural steel BOM might look like this:

Mark Description Material Qty. Length Unit Weight Total Weight
C101 W14×48 Column A992 6 9 m 71 kg/m 3,834 kg
B201 W18×35 Beam A992 12 8 m 52 kg/m 4,992 kg
BR301 HSS 6×6×3/8 Brace A500 8 6 m — —
PL401 Base Plate A36 6 — — 540 kg
PL402 Connection Plate A36 24 — — 310 kg

The actual BOM format will depend on project standards and fabrication requirements.

How BOMs Help Steel Fabricators

A reliable BOM provides significant benefits to fabrication shops.

Material Procurement

Fabricators can determine how much steel needs to be purchased.

Inventory Management

The BOM can be compared against existing stock.

Production Planning

Components can be organized according to fabrication requirements.

Cost Estimation

Steel quantities and weights can support project cost calculations.

Shipping

Assembly weights and dimensions can assist with transportation planning.

Waste Management

Material quantities can be analyzed to improve cutting and nesting strategies.

BOM and CNC Fabrication

The BOM is only one part of a modern digital fabrication workflow.

A detailed steel model can also provide information for CNC fabrication.

For example:

Tekla Model

↓

BOM

↓

Shop Drawings

↓

NC/CNC Data

↓

Fabrication

This reduces the amount of information that must be manually re-entered between different stages.

BOM Accuracy: Why Model Quality Matters

The quality of a BOM depends heavily on the quality of the underlying model.

If the model contains:

  • Incorrect member sizes.
  • Missing plates.
  • Incorrect quantities.
  • Wrong material grades.
  • Duplicate components.
  • Incorrect lengths.
  • Missing bolts.

then the BOM may also contain incorrect information.

Therefore:

A BOM is only as reliable as the data used to generate it.

This is why model checking is a critical part of steel detailing.

Common BOM Errors in Steel Detailing

Several mistakes can affect BOM accuracy.

Incorrect Member Lengths

Incorrect modeling can produce inaccurate material quantities.

Wrong Material Grades

Using the wrong grade can create procurement problems.

Duplicate Components

Duplicate modeled elements can inflate quantities.

Missing Components

Unmodeled plates, stiffeners, or connection components may be absent from the BOM.

Incorrect Numbering

Poor numbering practices can make it difficult to connect the BOM with shop drawings.

Outdated Reports

A BOM generated before the latest model revision may no longer reflect the current design.

Best Practices for Preparing a Steel BOM

1. Generate the BOM From the Final Checked Model

Avoid generating procurement information from an incomplete model.

2. Use Consistent Naming

Maintain consistent part and assembly marks.

3. Separate Material Categories

Where appropriate, separate:

  • Main steel.
  • Plates.
  • Bolts.
  • Miscellaneous steel.
  • Other purchased components.

4. Include Revision Information

The BOM should clearly identify the applicable project revision.

5. Cross-Check With Drawings

Verify that BOM quantities and marks correspond to the issued drawings.

6. Check Weight Calculations

Review total weights against expected project quantities.

7. Coordinate With the Fabricator

The BOM format should match the fabricator’s procurement and production workflow.

BOM and Steel Detailing: From Drawings to Fabrication

The modern steel detailing process can be visualized as a connected information chain:

Structural Design

↓

Steel Detailing

↓

3D BIM Model

↓

Model Checking

↓

Numbering

↓

Shop Drawings

↓

Bill of Materials

↓

CNC/Fabrication Data

↓

Fabrication

↓

Transportation

↓

Erection

A properly structured BOM helps maintain continuity throughout this process.

The Future of BOMs in Steel Detailing

The role of the BOM is evolving as the construction industry moves toward digital fabrication.

Future steel workflows are increasingly likely to integrate:

  • BIM.
  • Cloud collaboration.
  • Automated quantity extraction.
  • Digital fabrication.
  • CNC machinery.
  • Robotic welding.
  • Automated material tracking.
  • RFID/barcode systems.
  • Digital twins.
  • AI-assisted quality control.

Instead of treating the BOM as an isolated spreadsheet, companies can connect material information directly to the digital model and fabrication process.

This creates a more traceable workflow in which individual steel components can potentially be tracked from procurement through fabrication and erection.

Conclusion

A Bill of Materials (BOM) is a fundamental part of modern steel detailing. It converts information from the detailed steel model into an organized list of materials and components that can support procurement, fabrication, estimating, logistics, and construction.

For steel detailers, creating an accurate BOM requires more than generating a report. It requires a properly modeled and checked structure, correct material information, consistent numbering, and an understanding of how the fabricator will use the information.

With modern detailing platforms such as Tekla Structures, much of the BOM generation process can be automated from the 3D model.

The result is a connected workflow:

Accurate Model → Accurate Drawings → Accurate BOM → Better Fabrication

For steel fabrication projects, that connection can reduce manual work, improve material control, and help minimize costly errors and rework.

https://www.simsona.com/wp-content/uploads/2025/03/simsona-logo-2025.png 0 0 Praveen Kumar https://www.simsona.com/wp-content/uploads/2025/03/simsona-logo-2025.png Praveen Kumar2026-10-09 13:28:422026-10-09 13:40:24Bill of Materials (BOM) in Steel Detailing: A Complete Guide

Steel Detailing Checklist: A Complete Guide

September 25, 2026/in Blogs/by admin

Steel detailing checklist

 

Steel detailing is one of the most important stages between structural design and steel fabrication. A detailed and accurate steel model or shop drawing provides fabricators and erectors with the information required to manufacture, assemble, and install structural steel correctly.

Even a small detailing error can result in fabrication delays, material waste, field modifications, additional costs, or schedule disruptions. For this reason, a systematic steel detailing checklist should be used before drawings and fabrication information are released.

A steel detailing checklist provides a structured way to review structural members, connections, dimensions, bolts, welds, materials, drawings, bills of materials, and other project information. It also helps ensure that the final detailing package corresponds with the structural design documents and applicable project standards.

What Is a Steel Detailing Checklist?

A steel detailing checklist is a series of quality control checks performed during and after the steel detailing process. The purpose is to identify errors and missing information before shop drawings, fabrication drawings, and erection drawings are issued for fabrication or construction.

The checklist can be used for different types of structural steel projects, including commercial buildings, industrial facilities, warehouses, manufacturing plants, bridges, and other steel structures.

Depending on the project requirements, a checklist may cover:

Structural members.

Connections.

Dimensions and elevations.

Bolts and welds.

Base plates and anchor bolts.

Material specifications.

Shop drawings.

Erection drawings.

Bills of materials.

3D steel models.

Coordination with architectural and MEP models.

Revision control.

Quality assurance and quality control.

Applicable codes and project standards.

The exact checklist should be adapted to the contract documents, structural drawings, specifications, fabricator requirements, and jurisdiction applicable to the project.

Why Is a Steel Detailing Checklist Important?

The primary purpose of a checklist is to catch problems before they reach the fabrication shop or construction site.

A steel detailing error discovered during modeling may be relatively easy to correct. The same error discovered after fabrication can require a replacement part, field modification, additional welding, or rework.

A systematic review also improves coordination between the structural engineer, detailer, fabricator, general contractor, and erector.

A well prepared checklist can help verify that:

The steel model follows the structural design.

Member sizes and locations are correct.

Connections contain the required information.

Dimensions are consistent.

Bolts and welds are properly represented.

Fabrication drawings contain sufficient information.

Erection drawings provide clear installation information.

Bills of materials correspond with the model and drawings.

Revisions have been incorporated correctly.

Clashes and coordination issues have been identified.

Required project standards have been followed.

1. Review the Structural Design Documents

Before beginning a detailed review of the steel model or shop drawings, confirm that the latest structural design documents are being used.

Check the structural plans, sections, elevations, schedules, specifications, design drawings, connection requirements, and revision information.

Verify the project name, drawing numbers, revision numbers, issue dates, and applicable structural documents.

A common source of detailing problems is working from an outdated structural drawing. Therefore, document control should be the first step in the checklist.

The reviewer should confirm:

Latest structural drawings are available.

Latest revisions have been incorporated.

Structural member schedules are current.

Design specifications are available.

Connection design requirements are understood.

Architectural backgrounds are coordinated.

Relevant RFIs and design changes have been reviewed.

2. Check Steel Member Sizes and Locations

Every primary and secondary structural member should be checked against the structural design.

This includes beams, columns, braces, joists, trusses, girts, purlins, lintels, stairs, and other steel components included in the project.

Verify the member size, material grade, orientation, location, length, elevation, and connection conditions.

For example, a beam may have the correct size but still be incorrectly detailed if its elevation or orientation does not match the structural drawings.

Check:

Beam sizes.

Column sizes.

Brace sizes.

Member lengths.

Member orientation.

Member elevations.

Grid locations.

Offsets.

Slopes.

Splices.

Member numbering and marks.

3. Check Grid Lines and Building Dimensions

Grid lines provide the basic reference system for locating structural elements.

Check that the grids shown in the steel detailing model and drawings correspond with the approved structural and architectural documents.

Important checks include grid spacing, grid names, column locations, building dimensions, offsets, and reference dimensions.

Column centerlines should align correctly with the grid system unless an intentional offset is specified in the design.

Dimensions should also be consistent between plans, elevations, sections, and detail drawings.

4. Check Columns

Columns are major load carrying components, so their geometry and connections require careful review.

Verify column size, length, orientation, elevation, base condition, splice locations, and connections to beams and braces.

Check whether column splices are located as specified and whether sufficient information is provided for fabrication and erection.

Review:

Column section and material.

Column orientation.

Column base elevation.

Column top elevation.

Column splice details.

Beam to column connections.

Brace connections.

Base plates.

Anchor bolts.

Stiffeners.

Continuity plates.

Connection plates.

5. Check Beams and Secondary Members

Beams should be reviewed for correct size, length, location, slope, camber requirements, and connection information.

Secondary steel such as purlins, girts, bridging, kickers, and miscellaneous framing should also be included where required by the structural documents.

Pay particular attention to framing intersections. A beam may appear correct individually but create a coordination problem when connected to another member.

Check:

Beam size and grade.

Beam orientation.

Beam elevations.

Beam length.

Beam slope.

End connections.

Splices.

Stiffeners.

Copes.

Notches.

Holes.

Supporting conditions.

Secondary framing.

6. Review Steel Connections

Connections are among the most important elements in steel detailing.

Each connection should provide enough information for fabrication and erection while remaining consistent with the structural design or approved connection design.

Depending on the project, connections may include bolted, welded, moment, shear, brace, splice, base plate, and miscellaneous connections.

Check:

Connection type.

Connection geometry.

Connection plates.

Bolt diameter.

Bolt quantity.

Bolt spacing.

Bolt edge distances.

Bolt hole information.

Weld size.

Weld type.

Weld length.

Stiffeners.

Gusset plates.

Connection angles.

End plates.

Splice plates.

Connection orientation.

Connection clearances.

Where connection design is delegated to the fabricator or specialty engineer, the detailing review should also verify that the approved connection information has been incorporated correctly.

7. Check Bolts and Bolt Holes

Bolting information should be reviewed carefully because incorrect bolt quantities, sizes, locations, or hole types can create fabrication and erection problems.

Verify bolt diameter, grade, quantity, spacing, edge distance, and hole size.

Also check whether field and shop bolts are clearly identified according to the project requirements.

The checklist should cover:

Bolt size.

Bolt grade.

Bolt quantity.

Bolt spacing.

Gauge.

Edge distance.

Hole diameter.

Hole type.

Bolt orientation.

Field versus shop installation.

Bolt access.

Connection clearance.

8. Review Weld Information

Weld information should be clear and consistent with the applicable design and project requirements.

Check weld symbols, weld sizes, weld lengths, weld locations, and shop versus field weld requirements.

Particular attention should be given to welds that may be difficult to access after erection.

Verify:

Weld symbol.

Weld size.

Weld length.

Weld location.

Continuous or intermittent weld requirements.

Shop welds.

Field welds.

Weld accessibility.

Weld sequencing where relevant.

9. Check Base Plates and Anchor Bolts

Column base connections should be reviewed carefully because errors can affect the interface between steel and concrete.

Verify base plate dimensions, thickness, anchor bolt locations, bolt diameter, holes, stiffeners, welds, elevations, and grout requirements where applicable.

Coordinate anchor bolt locations with the concrete foundation drawings.

Check that:

Column location is correct.

Base plate dimensions are correct.

Anchor bolt layout is correct.

Anchor bolt diameter and grade are correct.

Bolt projection is shown where required.

Base plate holes are correctly located.

Stiffeners are included.

Required leveling or grout information is provided.

10. Review Shop Drawings

Shop drawings convert the steel model and design information into fabrication information.

Each drawing should contain sufficient dimensions, marks, materials, connection details, weld information, bolt information, and references for the fabricator.

Check:

Drawing title.

Drawing number.

Revision number.

Member mark.

Material specification.

Dimensions.

Weld information.

Bolt information.

Connection references.

Sections and details.

Piece marks.

Fabrication information.

General notes.

Drawing references.

The drawing should be clear enough for a fabricator to understand what needs to be manufactured without relying on assumptions.

11. Review Erection Drawings

Erection drawings are used at the construction site to identify where individual steel members belong.

They should provide clear information about member locations, orientations, elevations, grid references, piece marks, and erection sequences where required.

Check:

Grid references.

Column locations.

Beam locations.

Brace locations.

Member marks.

Elevations.

Orientation.

Erection views.

Connection references.

Piece marks.

Field connection information.

Temporary or permanent bracing information where required.

The erection drawings should correspond with the final fabrication drawings and approved steel model.

12. Check Piece Marks and Member Identification

Each fabricated steel component should have a clear identification system.

Piece marks allow the fabricator and erector to track individual components from the shop drawing to fabrication and finally to the construction site.

Check that piece marks are:

Unique where required.

Consistent.

Readable.

Correctly referenced.

Consistent between drawings and model.

Consistent with the bill of materials.

An incorrect piece mark can result in the wrong member being fabricated or installed.

13. Check Material Specifications

Material information should correspond with the structural design and project specifications.

Review steel grades, plate grades, bolt grades, welding materials, coatings, and other specified materials.

For each relevant component, confirm:

Material grade.

Section specification.

Plate specification.

Bolt grade.

Welding requirements.

Coating or paint requirements.

Galvanizing requirements where applicable.

Special material requirements.

Material substitutions should not be assumed during detailing unless they have been properly approved.

14. Review the Bill of Materials

The Bill of Materials, or BOM, provides information about the materials required for fabrication.

The BOM should be checked against the final steel model and drawings.

Verify quantities, member marks, section sizes, lengths, plate dimensions, material grades, and other required information.

Important checks include:

Member quantity.

Piece mark.

Section size.

Material grade.

Length.

Plate dimensions.

Weight.

Assembly information.

Miscellaneous steel.

The BOM should reflect the approved detailing model rather than an earlier design version.

15. Check Model and Drawing Coordination

For BIM based steel detailing projects, the 3D model is an important source of fabrication and coordination information.

The model should be reviewed for geometry, member relationships, connections, penetrations, clashes, and constructability.

Coordination should be performed with architectural, structural, MEP, and other relevant models.

Check for:

Beam and duct clashes.

Column and architectural element conflicts.

Brace and MEP conflicts.

Clearance problems.

Access problems.

Connection conflicts.

Opening conflicts.

Equipment interface issues.

Headroom problems.

The use of BIM coordination and clash detection can identify many issues before fabrication or erection.

16. Check Constructability

A steel model can be geometrically correct but still create practical fabrication or erection difficulties.

Constructability review considers how components will actually be fabricated, transported, assembled, and installed.

Consider:

Can the connection be fabricated?

Can bolts be installed?

Is there adequate wrench access?

Can welds be performed?

Can members be transported?

Can members be erected safely?

Are temporary erection requirements addressed where applicable?

Are there conflicts with adjacent construction?

Constructability review is particularly valuable for complex structures and congested connection areas.

17. Review Openings, Penetrations, and MEP Coordination

Steel framing frequently interacts with mechanical, electrical, and plumbing systems.

Openings and penetrations should be coordinated before fabrication.

Check whether ducts, pipes, cable trays, equipment, and other services require openings or clearance around structural members.

Any structural modification required to accommodate building services should follow the approved design process.

This is one of the areas where BIM coordination can significantly reduce field conflicts.

18. Check Tolerances and Clearances

Fabrication and erection require appropriate tolerances and clearances.

Review whether the detailing reflects the tolerances specified by the project documents and applicable standards.

Pay attention to:

Bolt hole clearances.

Connection clearances.

Erection clearances.

Member fit up.

Base plate clearances.

Architectural interfaces.

MEP clearances.

Equipment clearances.

Unrealistic or missing clearances can create problems during erection even when the overall model appears correct.

19. Verify Revisions and RFIs

Steel detailing projects frequently change during design development and construction.

Revisions may result from structural changes, architectural changes, MEP coordination, RFIs, connection design changes, or field conditions.

Before issuing drawings, verify that all approved changes have been incorporated.

Maintain a clear record of:

Drawing revisions.

RFI responses.

Design changes.

Approved connection changes.

Architectural changes.

MEP coordination changes.

Field changes.

Superseded drawings.

Revision clouds and notes should be used where required by the project document control system.

20. Final Quality Control Review

After individual components have been reviewed, perform a final overall quality control check.

The reviewer should look at the project as a complete system rather than only checking individual members.

Ask:

Does the model match the structural design?

Do the drawings match the model?

Do the piece marks match the BOM?

Are all major connections represented?

Are bolts and welds clearly identified?

Are dimensions complete?

Are elevations correct?

Are revisions incorporated?

Are architectural and MEP interfaces coordinated?

Are erection drawings consistent with fabrication drawings?

Are there unresolved clashes?

Are required approvals and notes included?

Only after the required checks have been completed should the drawing package be released according to the project’s approval process.

Steel Detailing Checklist at a Glance

A practical checklist can be organized into the following categories:

Checklist Area Key Items to Verify
Design documents Latest drawings, specifications, revisions
Grid system Grid lines, dimensions, offsets
Columns Size, location, elevation, splices
Beams Size, length, elevation, connections
Bracing Size, location, gusset plates, connections
Connections Geometry, bolts, welds, plates
Bolts Size, grade, quantity, spacing, holes
Welds Size, type, length, location
Base plates Dimensions, anchor bolts, stiffeners
Shop drawings Dimensions, marks, materials, details
Erection drawings Grid references, member marks, elevations
Materials Steel, plates, bolts, welding materials
BOM Quantity, marks, sizes, lengths, weights
BIM coordination Clashes, clearances, interfaces
Constructability Fabrication and erection requirements
Revisions RFIs, approved changes, drawing revisions
Final QC Overall model, drawing, and document consistency

Common Steel Detailing Errors to Look For

A checklist becomes particularly useful when reviewers understand the problems they are trying to identify.

Common steel detailing issues include incorrect member sizes, missing connections, incorrect elevations, inaccurate dimensions, wrong bolt information, missing welds, inconsistent piece marks, outdated revisions, incorrect material specifications, incomplete erection drawings, and coordination conflicts.

Another common problem is inconsistency between different deliverables. For example, the 3D model may contain one member length while the shop drawing shows another. Similarly, a piece mark may be correct on a shop drawing but incorrect in the BOM.

This is why the review should consider the model, drawings, schedules, and material information together.

 

Steel Detailing Quality Control: Who Should Perform the Review?

Depending on project size and contractual requirements, quality control may involve several parties.

A steel detailer checks the model and drawings during production. A dedicated checker or senior detailer may then perform an independent review. Structural engineers or connection engineers may review design related information where required. Fabricators and erectors may also identify practical issues related to manufacturing and installation.

A well structured QA/QC process therefore creates multiple opportunities to identify errors before they become costly field problems.

Final Thoughts

A steel detailing checklist is more than a list of items to tick before issuing drawings. It is a systematic quality control process that connects structural design, steel fabrication, and field erection.

The most important principle is consistency. The structural drawings, 3D steel model, shop drawings, erection drawings, connections, piece marks, and Bill of Materials should all communicate the same approved information.

For complex steel projects, combining experienced steel detailers with BIM modeling, clash detection, constructability review, and structured QA/QC can provide an effective approach to reducing detailing errors and fabrication rework.

At Simsona, steel detailing and BIM workflows can be integrated with structural design information and project coordination requirements to support accurate fabrication and erection documentation. A structured review process helps ensure that steel detailing deliverables are ready for the next stage of construction.

https://www.simsona.com/wp-content/uploads/2025/03/simsona-logo-2025.png 0 0 admin https://www.simsona.com/wp-content/uploads/2025/03/simsona-logo-2025.png admin2026-09-25 12:52:262026-09-25 12:53:22Steel Detailing Checklist: A Complete Guide

Steel Detailing vs Structural Steel Detailing: What’s the Difference?

July 30, 2026/in Blogs/by admin

Steel Detailing and structural steel detailing

Introduction

In the construction and structural engineering industry, the terms steel detailing and structural steel detailing are often used interchangeably. While they are closely related, they are not exactly the same. Understanding the distinction can help architects, engineers, fabricators, contractors, and project owners choose the right detailing services for their projects.

Structural steel detailing is a specialised branch of steel detailing that focuses on the primary load-bearing framework of buildings, bridges, industrial plants, warehouses, stadiums, and other infrastructure. Steel detailing, on the other hand, is a broader discipline that also includes miscellaneous and architectural steel components.

In this guide, we’ll explain the differences, applications, deliverables, and benefits of each service, helping you determine which solution best fits your project.

What Is Steel Detailing?

Steel detailing is the process of producing accurate fabrication and erection drawings for steel components used in construction projects. These detailed drawings ensure every steel element is manufactured, assembled, and installed according to the engineer’s design specifications.

Steel detailing acts as the bridge between structural design and fabrication. Detailers convert engineering calculations into practical shop drawings that fabricators and erectors use throughout the construction process.

A complete steel detailing package typically includes:

  • Shop drawings.
  • Erection drawings.
  • Fabrication drawings.
  • Material take-offs.
  • Bolt schedules.
  • Weld details.
  • CNC files.
  • Assembly drawings.
  • Bills of Materials (BOM).

Steel detailing covers a wide range of steel products, including structural, miscellaneous, and architectural steel.

What Is Structural Steel Detailing?

Structural steel detailing is a specialised discipline that focuses exclusively on the primary structural framework of a building or industrial facility.

These members are responsible for supporting the loads of the structure and transferring them safely to the foundation.

Structural steel detailing generally includes:

  • Columns.
  • Beams.
  • Girders.
  • Trusses.
  • Bracing systems.
  • Base plates.
  • Gusset plates.
  • Connection plates.
  • Anchor bolts.
  • Structural connections.

Every structural steel member must be accurately detailed to ensure proper fabrication, transportation, and installation while complying with project specifications and applicable design codes.

Steel Detailing vs Structural Steel Detailing

Feature Steel Detailing Structural Steel Detailing
Definition Broad discipline covering all steel components Focused on primary structural members
Scope Structural, miscellaneous, and architectural steel Structural load-bearing steel only
Components Railings, stairs, ladders, platforms, canopies, structural steel Beams, columns, braces, trusses, girders, connections
Purpose Fabrication of all steel products Structural integrity and safe load transfer
Deliverables Shop drawings, fabrication drawings, BOMs Structural shop drawings, connection details, erection drawings
Typical Projects Commercial, industrial, residential, infrastructure High-rise buildings, bridges, industrial plants, warehouses

Types of Steel Detailing

1. Structural Steel Detailing

This service focuses on the building’s structural skeleton and includes:

  • Beam detailing.
  • Column detailing.
  • Truss detailing.
  • Bracing detailing.
  • Steel connection detailing.
  • Base plate detailing.
  • Anchor bolt detailing.

2. Miscellaneous Steel Detailing

Miscellaneous steel detailing covers non-primary steel components such as:

  • Staircases.
  • Handrails.
  • Guardrails.
  • Ladders.
  • Platforms.
  • Catwalks.
  • Pipe supports
  • Equipment supports.
  • Roof access systems.

3. Architectural Steel Detailing

Architectural steel detailing emphasises aesthetics as well as functionality.

Common applications include:

  • Decorative staircases
  • Feature steelwork
  • Glass support systems
  • Architectural canopies
  • Façade support framing
  • Ornamental steel

Why Structural Steel Detailing Matters ?

Accurate structural steel detailing directly impacts the success of a construction project.

Improved Fabrication Accuracy

Detailed shop drawings minimise fabrication errors and reduce costly rework.

Faster Construction

Precise erection drawings enable smoother installation and minimise site delays.

Better Coordination

Structural steel detailing integrates seamlessly with architectural, mechanical, electrical, and plumbing models through BIM workflows.

Reduced Material Waste

Optimised detailing ensures efficient material usage and improves project profitability.

Code Compliance

Professional detailing ensures compliance with project specifications and industry standards.

Deliverables of Structural Steel Detailing Services

Professional structural steel detailing services typically include:

  • Structural shop drawings.
  • Steel fabrication drawings.
  • Steel erection drawings.
  • Connection detailing.
  • Anchor bolt plans.
  • Base plate details.
  • Assembly drawings.
  • Single-part drawings.
  • General arrangement drawings.
  • Bolt schedules.
  • Weld schedules.
  • Material take-offs.
  • Bills of Materials (BOM).
  • CNC data files.
  • NC1/DSTV files.

Industries That Benefit from Structural Steel Detailing

Structural steel detailing is widely used across multiple industries, including:

  • Commercial buildings.
  • Residential developments.
  • Industrial facilities.
  • Warehouses.
  • Manufacturing plants.
  • Airports.
  • Hospitals.
  • Educational institutions.
  • Sports stadiums.
  • Bridges.
  • Power plants.
  • Oil and gas facilities.
  • Mining projects.

Software Used for Structural Steel Detailing

Modern detailers rely on advanced software to improve precision and collaboration.

Popular platforms include:

  • Tekla Structures.
  • Autodesk Advance Steel.
  • Autodesk Revit.
  • SDS2.
  • AutoCAD.
  • Navisworks.
  • BIM 360.

These tools enable clash detection, automated drawing generation, material tracking, and BIM coordination.

Why Choose Professional Structural Steel Detailing Services?

Experienced steel detailers help projects move efficiently from design to fabrication by delivering accurate, coordinated, and fabrication-ready documentation.

A professional detailing partner can provide:

  • Experienced detailers
  • BIM-enabled workflows
  • High-quality shop drawings
  • Fast turnaround times
  • Strict quality control
  • Compliance with international standards
  • Coordination with architects, engineers, and fabricators
  • Cost-effective detailing solutions

Whether you’re constructing a commercial building, industrial plant, warehouse, or bridge, professional structural steel detailing helps reduce project risks while improving construction efficiency.

Frequently Asked Questions

Is structural steel detailing the same as steel detailing?

Not exactly. Structural steel detailing is a specialised subset of steel detailing that focuses on the primary load-bearing framework. Steel detailing is a broader term that also includes miscellaneous and architectural steel.

What drawings are included in structural steel detailing?

Typical deliverables include shop drawings, erection drawings, connection details, fabrication drawings, bolt schedules, weld schedules, Bills of Materials (BOM), and CNC files.

What is miscellaneous steel detailing?

Miscellaneous steel detailing covers secondary steel components such as stairs, ladders, railings, platforms, and other non-primary structural elements.

Which software is commonly used for structural steel detailing?

Popular software includes Tekla Structures, Autodesk Advance Steel, SDS2, Revit, AutoCAD, and Navisworks.

Why is structural steel detailing important?

Accurate detailing reduces fabrication errors, improves coordination, speeds up construction, minimises material waste, and supports successful project delivery.

Conclusion

Although the terms steel detailing and structural steel detailing are frequently used interchangeably, they represent different scopes of work. Steel detailing is the broader discipline encompassing structural, miscellaneous, and architectural steel, while structural steel detailing focuses exclusively on the load-bearing framework that forms the backbone of a structure.

Choosing an experienced structural steel detailing partner ensures accurate shop drawings, seamless BIM coordination, efficient fabrication, and successful project execution. Whether your project involves commercial buildings, industrial facilities, bridges, or complex infrastructure, investing in high-quality structural steel detailing services helps improve accuracy, reduce costs, and keep construction on schedule.

https://www.simsona.com/wp-content/uploads/2025/03/simsona-logo-2025.png 0 0 admin https://www.simsona.com/wp-content/uploads/2025/03/simsona-logo-2025.png admin2026-07-30 12:58:142026-08-14 07:09:34Steel Detailing vs Structural Steel Detailing: What’s the Difference?

Role of Steel Detailing in Structural Engineering Projects | Simsona

June 27, 2025/in Blogs/by admin
Read more
https://www.simsona.com/wp-content/uploads/2025/03/cad.png 1080 1080 admin https://www.simsona.com/wp-content/uploads/2025/03/simsona-logo-2025.png admin2025-06-27 13:22:012026-04-22 11:12:32Role of Steel Detailing in Structural Engineering Projects | Simsona

Steel Detailing vs Rebar Detailing || Simsona

June 24, 2025/in Blogs/by admin
Read more
https://www.simsona.com/wp-content/uploads/2025/06/Steel-Detailing.png 1080 1920 admin https://www.simsona.com/wp-content/uploads/2025/03/simsona-logo-2025.png admin2025-06-24 11:08:252026-04-22 11:23:42Steel Detailing vs Rebar Detailing || Simsona

Importance of Steel Detailing || Simsona

June 23, 2025/in Blogs/by admin
Read more
https://www.simsona.com/wp-content/uploads/2025/06/Importance-of-Steel-Detailing.png 1080 1920 admin https://www.simsona.com/wp-content/uploads/2025/03/simsona-logo-2025.png admin2025-06-23 10:44:042026-04-22 12:27:24Importance of Steel Detailing || Simsona
steel fabrication

Steel Fabrication and Its Applications || Simsona

June 4, 2025/in Blogs/by admin
Read more
https://www.simsona.com/wp-content/uploads/2025/06/Untitled-design-9.png 1080 1920 admin https://www.simsona.com/wp-content/uploads/2025/03/simsona-logo-2025.png admin2025-06-04 11:41:372026-04-27 11:29:07Steel Fabrication and Its Applications || Simsona

Common Mistakes to Avoid in Steel Detailing | Simsona

May 28, 2025/in Blogs/by admin
Read more
https://www.simsona.com/wp-content/uploads/2025/05/Untitled-design-8.png 1080 1920 admin https://www.simsona.com/wp-content/uploads/2025/03/simsona-logo-2025.png admin2025-05-28 10:33:452026-04-23 13:09:28Common Mistakes to Avoid in Steel Detailing | Simsona
Outsourcing steel detailing

Benefits of Outsourcing Steel Detailing || Simsona

April 30, 2025/in Blogs/by admin
Read more
https://www.simsona.com/wp-content/uploads/2025/04/Add-a-heading.png 1080 1920 admin https://www.simsona.com/wp-content/uploads/2025/03/simsona-logo-2025.png admin2025-04-30 08:34:012026-04-23 10:47:31Benefits of Outsourcing Steel Detailing || Simsona
Steel Detailing Process

The Process of Steel Detailing: A Step-by-Step Guide  

April 18, 2025/in Blogs/by admin
Read more
https://www.simsona.com/wp-content/uploads/2025/04/Steel-Detailing-Process.png 1080 1920 admin https://www.simsona.com/wp-content/uploads/2025/03/simsona-logo-2025.png admin2025-04-18 09:43:072026-04-22 12:30:11The Process of Steel Detailing: A Step-by-Step Guide  
Page 1 of 212

Architectural Projects

  • BAPS Temple
  • BJ’s Warehouse Club
  • Potomac Construction Company Inc.
  • Carlisle Church Phase 1
  • Carlisle Church Phase 2
  • Central Wholesaler
  • Gainesville Commerce Center
  • Peter Pan
  • Thompson Creek Windows
  • Route 124 Center
  • Contemporary House Design, Rockville
  • Office Building in NY
  • Summerline AAA Ballpark
  • The City of Laugheed
  • McKinney Fire Station
  • 718 Clay Street
  • Edgewater Elementary School

SERVICES

  • ARCHITECTURAL BIM SERVICES
  • STRUCTURAL BIM SERVICES
  • MEP BIM SERVICES

LOCATIONS

Maryland, California, New Delhi, and Chennai

linkedin logo     facebook logo

CERTIFICATIONS

mdot_mbe_dbe_sbe_certified

Simsona Corporation

1451 ROCKVILLE PIKE, SUITE #250

ROCKVILLE, MD 20852

PHONE: 301-774-0880

EMAIL: RAJ@SIMSONA.COM

OTHER STATE CERTIFICATIONS

NEW JERSEY DBE CERTIFIED

ARIZONA DBE CERTIFIED

COLORADO DBE CERTIFIED

HAWAII DBE/SBE CERTIFIED

TEXAS DBE CERTIFIED

CALIFORNIA DBE CERIFIED

WASHINGTON STATE DBE CERTIFIED

OFFICE HOURS (EST)

MONDAY-FRIDAY: 7:00AM-7:00PM
SATURDAY: 8:00AM-4:00PM

OTHER SERVICES

CPM SCHEDULING

DESIGN SERVICES

 

 

© Copyright - Simsona Corporation - Enfold Theme by Kriesi
Scroll to top Scroll to top Scroll to top