Masonry has been one of the oldest and most reliable methods of construction, used for building walls, partitions, columns, and even decorative features. Whether it’s brickwork, blockwork, or stone masonry, estimating the quantity and cost of masonry work accurately is critical for the success of any construction project.
What is Masonry Estimation?
Masonry estimation is the process of calculating the quantity of materials, labor, and associated costs required to complete masonry work in a construction project. It involves measuring walls or structures, determining the number of bricks or blocks needed, calculating mortar volume, considering wastage, and estimating labor hours. An accurate estimate helps project managers and contractors plan budgets, procure materials, schedule work, and avoid cost overruns.
Importance of Masonry Estimation
A well-prepared masonry estimate brings multiple benefits:
- Cost Control: By calculating the exact quantities of bricks, blocks, stones, mortar, and other materials needed, contractors can prepare realistic budgets and avoid costly surprises during execution. For example, underestimating the amount of brickwork can lead to sudden material shortages, price fluctuations, and urgent purchases at premium rates—all of which can inflate project costs.
- Resource Planning: Masonry estimation is not limited to materials alone. It also informs labor requirements and equipment needs. By understanding these requirements upfront, contractors can allocate teams efficiently and avoid bottlenecks or unplanned hiring costs.
- Project Scheduling: Masonry estimation directly supports realistic project timelines. Knowing exactly how much material and labor will be required at different phases allows project managers to schedule tasks, labor teams, and deliveries more precisely. This reduces delays caused by missing materials or idle labor.
- Minimized Waste: Masonry materials are bulky, heavy, and often site-specific in size and quality. A well-prepared estimate ensures optimal ordering, storage, and use of materials, promoting sustainability and cost efficiency.
- Reduces Risk of Disputes: Detailed masonry estimation provides clear documentation that can help prevent disputes between clients, contractors, and subcontractors. When everyone agrees on the scope, quantities, and cost upfront, there’s less room for misunderstandings later.
Key Steps in Masonry Estimation
Below are the common steps involved in estimating masonry work:
Study the Drawings and Specifications
Begin by carefully reviewing architectural and structural drawings. These drawings provide vital information about the type and extent of masonry work, including the dimensions of walls, thicknesses, heights, and the locations of openings such as doors and windows.
Measure Wall Dimensions
This involves noting down the length and height of each wall, the wall thickness, and details for additional structures like parapets, columns, or retaining walls. It is equally important to record the dimensions of all openings so that deductions can be made. Accurate measurements form the base for calculating the total area or volume of masonry work required.
For example,
Length: 40 ft
Height: 8 ft
Thickness: 0.67 ft (8 inches)
Gross Volume:
40 ft × 8 ft × 0.67 ft = 214.4 cubic feet
No openings, so net volume = 214.4 cu ft
Calculate Brick or Block Quantity
With the net volume known, the next step is to figure out how many bricks or blocks are needed. This involves calculating the volume of a single unit, including the space for mortar joints. By dividing the net masonry volume by the volume of one brick or block, the estimator arrives at the total number of units required for the project. It is good practice to add an allowance for wastage — usually around 3% to 5% — to cover breakage and cuts on site.
For example,
Assume standard brick size with mortar: 8″ x 4″ x 2.67″
Volume of one brick with mortar:
8 in × 4 in × 2.67 in = 85.44 in³
Convert to cubic feet: 85.44 in³ ÷ 1728 in³/ft³ = 0.0495 cu ft
So, bricks needed = Net Wall Volume ÷ Volume of 1 brick
= 214.4 cu ft ÷ 0.0495 cu ft ≈ 4,331 bricks
Add 5% for breakage:
4,331 × 1.05 ≈ 4,548 bricks
Estimate Mortar Quantity
Masonry work depends heavily on mortar to bind the units together. Estimating the mortar quantity involves determining the portion of the wall volume that will be occupied by mortar. Typically, mortar accounts for about 25% to 30% of the total wall volume in brickwork. This wet volume of mortar must be adjusted for wastage and then converted into dry material quantities for cement and sand based on the specified mix ratio. In addition to bricks and mortar, estimators should account for related materials such as lintels above openings, damp-proof courses, reinforcement for reinforced masonry, wall ties, or scaffolding.
For example,
Approx. 25% of wall volume is mortar:
25% of 214.4 cu ft = 53.6 cu ft
Calculate Labor Requirements
This depends on the productivity rates of masons and helpers, which vary with the complexity of work and site conditions. By knowing the total number of bricks and daily productivity, the estimator can calculate the number of labor days needed and plan accordingly. Additional equipment like scaffolding or mixing tools should also be considered.
For eample
Assume 2 masons + 1 helper:
- A mason in the US might earn $35/hour.
- A helper might earn $20/hour.
Estimate 5 days @ 8 hrs/day:
- 2 masons: 2 × $35 × 8 hrs × 5 days = $2,800
- 1 helper: $20 × 8 hrs × 5 days = $800
Total Labor: $3,600
Prepare Cost Estimate
With all quantities in hand, the next step is to translate them into costs. This includes multiplying the quantities of bricks, mortar materials, and other items by their current market rates. Labor costs are calculated based on the estimated man-days and local wage rates. Transportation, handling, storage, and site overhead costs should also be factored in. Finally, the estimator adds a contingency allowance and the contractor’s margin to arrive at the total masonry cost estimate.
For example,
Bricks:
Unit cost ≈ $0.80 per brick (average range in the US for common face bricks)
4,548 bricks × $0.80 = $3,638.40
Mortar Materials:
1 cu ft of mortar ≈ 1 bag of cement + 3 cu ft of sand (simplified)
So, 53.6 cu ft needs ≈ 13–14 bags of cement + 160 cu ft of sand.
- Cement: 14 bags × $12/bag = $168
- Sand: 5 tons × $35/ton (approx.) = $175
Scaffolding, Tools, Misc.:
Say $200 for basic temporary scaffolding, wheelbarrows, mixing pans, trowels.
Final cost
Item | Cost (USD) |
Bricks | $3,638.40 |
Mortar Cement | $168.00 |
Mortar Sand | $175.00 |
Tools & Scaffolding | $200.00 |
Labor | $3,600.00 |
Subtotal | $7,781.40 |
Contingency (5%) | ~$390.00 |
Total Estimated Cost | $8,171.40 |
Conclusion
For a free quotation on your structural steel detailing project requirements, feel free to contact us or email us at RAJ@SIMSONA.COM. Our experienced team is always ready and proud to support your project with precision and professionalism.
Send Us
drawings and scope
Click the Dropbox link and send us your complete scope and drawings.
We will provide estimate in 24 to 48 hours.